A whole home renovation is the most complex residential project there is. Every trade and every system in the house lands on one timeline. Keeping that many moving parts on one timeline is the exact problem a commercial schedule is built to solve. Your renovation gets the same formal schedule, daily reporting, and budget tracking a commercial job runs on. You work directly with the owner, start to finish.
What Does a Whole Home Renovation Actually Include?
A whole house remodel can mean anything from updating every room in a 1990s colonial to stripping a pre-war house down to the framing and rebuilding every system from scratch. The scope changes the cost, the timeline, and the number of trades involved. Below are the most common versions of this project that we take on in the Merrimack Valley.
Full Gut Renovation
Studs out, every system replaced. New electrical, plumbing, HVAC, insulation, drywall, and finishes throughout. Typical timeline is 4 to 8 months.
Historic Home Renovation
Pre-1940 homes in Bradford and the Highlands come with knob-and-tube, cast iron, non-standard framing, and potential lead or asbestos. We document existing conditions before demo starts.
Floor Plan Reconfiguration
Moving walls, opening up spaces, and rethinking how the house flows. Structural engineering determines what can move and what stays.
Basement Finishing
Waterproofing, framing, electrical, plumbing, HVAC extension, and egress compliance. Often the only way to add square footage without building an addition.
Systems Upgrade
New electrical panels, plumbing lines, HVAC, and insulation. When walls are already open, that is the time to modernize everything at once.
Phased Renovation
One section at a time while you stay in the house. Each phase gets its own schedule and budget so you can spread the investment over time.


How Much Does a Whole Home Renovation Cost in Massachusetts?
Whole home renovation costs in Massachusetts vary widely based on the scope of work, the age of the house, and the level of finishes. A gut renovation typically runs $100 to $250 or more per square foot, depending on the complexity of the mechanical systems, structural changes, and material selections.
Historic homes in areas like Haverhill’s Bradford neighborhood or the Highlands typically add 10 to 20 percent to the cost. A house with knob-and-tube wiring, a failing foundation, and original cast iron plumbing is a different project than a 1980s ranch that just needs cosmetic updates and new mechanicals.
The working range for a full gut across the Merrimack Valley, from systems and framing through finishes.
The all-in range that per-square-foot pricing puts on a full renovation at that footprint.
Period-appropriate details, non-standard framing, hazardous material abatement, and code-compliance upgrades all contribute to that increase.
The biggest cost drivers on any whole home renovation: how much demolition is required, whether the floor plan changes (structural engineering and permits), the grade of finishes you select, the number of bathrooms and kitchens being rebuilt, and how much of the electrical and plumbing needs to be brought up to current code.
We break down every estimate by trade and material so you can see exactly where the money goes. If scope changes during construction, a written change order with the cost adjustment goes in front of you before any additional work happens. That is how budgets get controlled on a large commercial job, and your renovation gets the same discipline.
Inside a Haverhill Whole Home Renovation
All ProjectsThese rooms are from one project: a full renovation in Haverhill where every space in the house was rebuilt on a single schedule. The same finishes, the same trades, one timeline from demo to walkthrough.



How We Manage Your Whole Home Renovation
A whole home renovation has more trades and longer timelines than any other residential project. This is what you will see from us at every stage.
Pre-Construction Planning
Full scope, project schedule, and phasing plan defined before any work begins. Typically 2 to 4 weeks.
Permitting and Engineering
We pull all permits, schedule inspections, and build varying town timelines into the schedule from the start.
Demolition and Discovery
Every discovery gets documented with photos and a written change order before we proceed. No surprises on the final invoice.
Trade Coordination
10+ subcontractor trades on one timeline. If one is late, everything behind it shifts. We hold that sequence the way a commercial schedule holds it, trade by trade.
Daily Documentation
Photos and a progress summary every day there is work happening. Every wall photographed before it closes up.
Final Walkthrough
We walk every room together. Every punch list item closed out before you make the final payment.
What Homeowners Say About Working With A. Will Construction
“Can’t say enough good things about this company. Super professional, reliable, and the quality of work speaks for itself. You can tell they actually care about the details and take pride in what they do. Hard to find people nowadays that communicate well, show up when they say they will, and still overdeliver. If you’re looking for a construction company that’s trustworthy and gets the job done right, this is definitely one I’d recommend. Thank you Anthony!”Estefani G., Google review
“I’ve seen how A Will C creates incredible transformations/constructions within really small timeframes, their work is characterized by professionalism, high standards and detail orientation.”Elian C., Google review
“This team did a fantastic job with my recent bath remodel. Anthony was incredibly professional and very reliable from the moment he visited for the estimate until the end. He and his team were efficient during the entire construction, not wasting time, paying attention to details, and making sure to not damage or dirty the rest of the house. I will 100% use them again for my next project!!”Jake M., Google review
10 five-star reviews on Google. The consistent theme across every review: they communicated throughout the project and delivered on every detail.
Common Questions About Whole Home Renovations
How long does a whole home renovation take?
Most whole home renovations run 4 to 8 months depending on the scope, the size of the house, and how much structural or mechanical work is involved. A full gut renovation of a 2,000 square foot home with significant layout changes will take longer than a systems-and-finishes update on a house with a good floor plan. We build a detailed project schedule before work starts, and you will see the projected completion date before you commit.
Can I stay in my home during a gut renovation?
In most cases, no. A full gut renovation means your electrical, plumbing, and HVAC will be disconnected for extended periods. The house will not be livable during the rough-in phase. If you are doing a phased renovation, we can plan it so that sections of the house remain functional while we work on others. We will tell you honestly during the consultation whether staying in the house is realistic for your project.
What should I know about renovating a historic home in Haverhill?
Homes built before 1940, which includes a large portion of Haverhill’s housing stock in Bradford and the Highlands, come with specific challenges. Knob-and-tube wiring needs to be replaced. Cast iron drain lines may need to be swapped for PVC. Plaster-and-lath walls are heavier and messier to demo than drywall. Lead paint and asbestos are common and require licensed abatement. Framing dimensions do not match modern lumber, which affects how new work ties into existing structure. None of this is unusual for a contractor who works in this area regularly, but it has to be accounted for in the budget and timeline from the beginning.
What permits are needed for a whole home renovation?
A whole home renovation typically requires a building permit, electrical permit, plumbing permit, and sometimes a mechanical permit depending on the HVAC scope. If you are changing the footprint or adding square footage, you may also need zoning review. Haverhill, Andover, North Andover, Methuen, and Salem NH all have their own permitting offices and inspection schedules. We handle all of it, from application through final inspection signoff.
What drives the cost of a whole home renovation?
The biggest cost factors are the scope of demolition (cosmetic update versus full gut), structural changes (moving walls, adding openings), the number of kitchens and bathrooms being rebuilt, the age and condition of the existing mechanical systems, and the grade of finish materials you select. Historic homes tend to cost 10 to 20 percent more than comparable newer homes because of the additional discovery work, hazardous material handling, and code-compliance upgrades required.
What areas do you serve for whole home renovations?
We are based in Haverhill, MA and serve the Merrimack Valley and surrounding areas. That includes Groveland, Merrimac, Salem NH, Andover, North Andover, Plaistow NH, Methuen, Lawrence, Amesbury, Georgetown, Salisbury, and Newburyport. If you are within about 45 minutes of Haverhill, call us at 617-759-5553 and we will let you know if we can take on your project.