Project Portfolio

Our Projects, Documented From Demo Day to Final Walkthrough

Photos are part of how we run a job. Every day there is work happening, the client gets a daily report with pictures of what got done. By the end of a project, that adds up to a complete record of the house: before, during, and after. Everything on this page comes straight from those files. Every project shown here was run by the owner, start to finish.

Based in Haverhill, MA  ·  Licensed and insured · CSL CS-118371 · HIC 220449
Remodeled dining room with a coffered ceiling, a brass globe chandelier and a view into the living room
Dining Room Remodel · Haverhill, MA
Featured Project

Whole Home Renovation in Haverhill, MA

A full interior renovation, top to bottom. Kitchen, dining room, living room, foyer, stairs, bedrooms, and both bathrooms, plus a structural wall removal that opened the kitchen to the dining room. The owners got a daily report with photos through the whole build, so there was never a week where they wondered what was happening in their own house. This is the scope our whole home renovation service is built around.

Before
Kitchen before remodeling, with oak cabinets, a chest freezer and mismatched built-ins
01The load bearing wall between the kitchen and dining room came out right here. The existing back door was relocated and replaced with a larger sliding glass door. Shown before the new cabinets and appliances went in on this wall.
Before
Kitchen before remodeling, with oak cabinets, yellow walls and a worn hardwood floor
After
White kitchen with a quartz island, upholstered stools and a brass chandelier
02The transformation, with that wall gone. Taken down to the studs and rebuilt with a new layout, island, cabinetry, and lighting. The same trades we coordinate on every kitchen remodel.
Before
Living room before remodeling, looking through to the foyer and staircase
After
Living room opening through to the foyer staircase on one side and the dining room on the other
01Living Room and Foyer · Haverhill, MA

Living Room and Foyer

Refinished floors, new trim, and sight lines through to the dining room.

A project like this only stays on schedule when the trades land in the right order: demolition, structural work, rough plumbing and electrical, inspections, insulation, drywall, floors, then finishes.

Before
Foyer before remodeling, with a wood front door, two-tone walls and worn hardwood
After
Foyer with wainscoting, a lantern pendant and the original staircase and newel post
02Foyer and Entry · Haverhill, MA

Foyer and Entry

New flooring, lighting, and paint from the front door up.

Each phase closed out before the next one opened, and the schedule showed the dates before demo started.

Before
Bedroom before remodeling, with blue walls, a ceiling fan and a worn hardwood floor
After
Nursery with sage green walls, a coffered ceiling, a dresser and a glider chair
03Bedroom to Nursery · Haverhill, MA

Bedroom to Nursery

Paint, flooring, and lighting, finished on schedule before the baby arrived.

Progress showed up in that evening’s daily report, photos included.

Before
Powder room before remodeling, with a wall-hung sink under a sloped ceiling
After
Powder room with a dark green accent wall, a round brass mirror and a wall-hung sink
04Powder Room · Haverhill, MA

Powder Room

Rebuilt in the same footprint. New fixtures, mirror, and lighting.

One of two bathrooms redone in this house on the same schedule.

Staircase with dark treads and the original stained glass window on the landing
05Stairs and landing, refinished with the original stained glass kept in place
Hallway looking into the finished kitchen with an island and brass pendants
06Hallway into the finished kitchen

The Finished Details

Stairs, landings, and hallways carry the same finish standard as the headline rooms.

The System

How Do We Document Every Project?

Three things run on every job: a written schedule with real dates, daily reports with photos on every work day, and written change orders before any cost moves. Every before and after photo on this page started as a job record inside one of those reports. The same schedule and reporting system runs on every A. Will Construction project, whether it is a powder room or a whole house.

The reports serve a second purpose. When a question comes up months after the walls are closed, we can pull the photo record and show exactly what sits behind the drywall, where the blocking is, and how the rough-ins ran. That record stays with the project.

During
Structural wall removal between the kitchen and dining room, with the new header and temporary supports in place
01Structural wall removal between the kitchen and dining room, shot for that day’s report. The owners saw this photo the evening it was taken.

Bathroom Remodels

Bathroom Remodeling

Two recent bathroom projects, both gutted and rebuilt. The first was part of the Haverhill whole home renovation above. The second, in Tewksbury, replaced a dated bathroom with new tile, a new vanity, and updated plumbing, and included a tub to shower conversion in the second bath.

A bathroom is a small room with a lot of trades in it. Plumbing, electrical, waterproofing, tile, and ventilation each have to pass inspection in the right sequence, which is why a written schedule matters as much in sixty square feet as it does in a whole house.

Before
Dated bathroom before remodeling, with worn wall tile, an old vanity and damaged flooring at the doorway
After
Bathroom with a walnut floating vanity, brass fittings and a black hexagon tile floor
01Full bathroom, gutted to the studs and rebuilt · Haverhill, MA
Before
Narrow bathroom before remodeling, with a laminate vanity, patterned vinyl floor and a shower bench
After
Remodeled bathroom with a white shaker vanity, a brass mirror and sconce, and patterned floor tile
02Bathroom remodel with new vanity, tile, and fixtures · Tewksbury, MA

Basement Remodel

A basement built out as real living space: kitchenette, bedroom, and a full bathroom. Basement work gets planned in a strict order. Moisture control, egress, insulation, and mechanical rough-ins all get inspected before a single finish goes in, because redoing drywall is cheap and redoing what sits behind it is not. Basement buildouts run through the same process as the rest of our renovation work.

Basement kitchenette with white shaker cabinets and full-size appliances
01Basement Kitchenette
Finished basement bedroom with a sliding closet door and dark plank flooring
02Basement Bedroom
Basement bathroom with a white tub and shower, black fixtures and built-in corner shelving
03Basement Bathroom
★★★★★
“Can’t say enough good things about this company. Super professional, reliable, and the quality of work speaks for itself. You can tell they actually care about the details and take pride in what they do.”
Estefani G., Google review
★★★★★
“Reliable and punctual! Thank you Anthony!”
Nelley K., Google review
★★★★★
“Great to work with! Very professional highly recommend!”
Edward E., Google review

Want This Level of Documentation on Your Project?

Tell us what you are planning. We will walk the space, put a real schedule together, and keep you informed from demo day to the final walkthrough.